Toolset laid out on a workbench with a business jet in the hangar behind.
ERP

The back office that runs itself.

Parts, tags, tools, capabilities, and the audit posture, all tied to the same visit and work order data the floor is running.

coreop.io
coreop.io

Audit readiness

Skyline MRO · live

Snapshot Jul 02

Missing signatures

2

Expiring credentials

3

Unassigned 8130 tags

0

Calibration lapses

1

Open items

TPE331 sched. B · R. Mendez expiring Oct 202660 days
Borescope T-311 calibration overdue 4 daysOverdue
Task T-14 · Rigging check awaiting inspectorPending
Auditor could walk in tomorrowExport audit pack
Parts and receiving

Parts on hand. Parts on order. Parts on the aircraft.

Every part carries part number, serial or lot, condition, and certificate. Purchase orders push out to suppliers with your standard terms. Receiving matches on the way in. Consumption at the task card ties the 8130 to the work performed. The tail knows what was installed and where it came from.

On order

Purchase orders

POs push out to suppliers with your standard terms. Expected receipt tied to the work order that needs the part.

On the dock

Receiving

Match on the way in. 8130 tag captured. Serial or lot, condition, and certificate authority stored on the part row.

On the shelf

Inventory

Bin location, condition, and reserved for open work orders. Rotables tracked with cycles between overhauls.

On the aircraft

Consumption

Task card consumption ties the 8130 tag to the task, the WO, the visit, and the aircraft. The tag travels with the record.

coreop.io

Parts and traceability

Inbound receiving · WO-2026-0483

5 parts

Part #DescriptionSerialTagQtyPO
9910289-3Fastener, cowl, structuralAK48218130-32PO-1174
3-1092-2Tire, main gear, 22x6.5-10TR901188130-31PO-1174
622-5137-002Nav receiver, VHFGR628418130-31PO-1181
MS20470AD4-6Rivet, aluminum, universal-8130-348PO-1174
1H4-4Lamp, incandescent, cabin-8130-34PO-1183
Condition SVC on all$1,148.20 received
8130 traceability

Every tag travels with the part.

The 8130-3 tag is captured at receiving with the serial or lot, the certificate type, the release condition, and the issuing authority. When the part is consumed on a task card, the tag attaches to the task, the work order, the visit, and the aircraft record. Pulling the audit pack for a serialized part becomes one search.

  • Tag captured at receiving with certificate type, release condition, and issuing authority.
  • Attached to the task, the work order, the visit, and the aircraft on consumption.
  • Search by serial, by tag number, by aircraft. Audit trail is a query, not a folder hunt.
coreop.io

8130-3 traceability

Part 9910289-3 · AK4821

1 of 5 on WO-0483

8130-3Authorized release certificate
Verified
Part number9910289-3
DescriptionFastener, cowl, structural
SerialAK4821
ConditionSVC · New surplus
Certifying authorityCessna Aircraft Company
Cert #CE-2026-11284
ReceivedJul 01 2026 · PO-1174
Installed onN724MJ · WO-0483 · T-04
Chain of custodyVendor → shop → aircraft
Tool crib and calibration

Every tool. Every calibration. Every check out.

The tool crib knows what is out, who has it, when it is due back, and when the next calibration is due. Precision tooling gets tied to the task cards it is used on so a lost calibration cycle does not orphan the sign off.

Nothing walks out the door without a check out. Calibration expiries surface on the compliance strip so the sign off cannot fire against a lapsed instrument.

coreop.io

Tool crib

Shop A · check in / out

5 shown · 34 total

ToolIDAssignedStatus
Torque wrench 20-150 lb·inT-014R. MendezChecked out
Rigging fixture · CJ2 aileronT-208D. SatoChecked out
Digital multimeter Fluke 87T-104-Available
Borescope · Olympus IPLEXT-311A. VasquezCal due
Jack, tripod, 5-tonT-039-Available
1 calibration dueNext audit: Oct 12
Capabilities

What your shop is authorized to do.

The capability list carries the make and model, the inspection type, and the authorization your shop holds. When a customer requests work outside the current capability list, the intake surfaces the mismatch instead of quietly booking a visit the shop cannot release. The capability list itself is a record an auditor can read straight from the app.

coreop.io

Capability list

Skyline MRO · Part 145 CRS

OpSpec current

Make / modelScopeAuthorityStatus
Cessna Citation CJ1 / CJ2 / CJ2+Airframe, engine, avionicsOpSpec A003Current
Cessna Citation M2 / CJ3Airframe, avionicsOpSpec A003Current
Beechcraft King Air 200 / 250Airframe, engine (TPE331)OpSpec A004Current
Pilatus PC-12Airframe onlyLtd ratingRenewal
4 makes on OpSpec1 renewal due Nov
Back office

Accounting, payroll, reporting, all on the same visit data.

Accounting sync pushes invoices, payments, and deposits to your ledger of record. Payroll pulls labor time from the tasks the technicians actually logged. Reporting reads the same visits, work orders, and parts as the floor sees. Nothing recompiled from a spreadsheet.

Accounting sync

Ledger of record

Invoices, payments, and deposits push to the accounting system. Reconciliation is a query, not a monthly project.

Payroll

Labor from the tasks

Technician time posts from task card labor. Payroll reads what the floor actually logged, not what somebody typed on Friday.

Reporting

Live shop reports

Utilization, throughput, gross margin per visit, and AR aging all read the same source of truth as the floor.

Audit readiness

An auditor could walk in tomorrow.

Audit readiness is a live view of what an auditor will ask for. Not a report you assemble the night before. Not a folder hunt across shared drives. What is missing, what is expiring, what needs a signature, what needs a tag, what needs a calibration. All present. All searchable.

Signatures
Every sign off, ready to pull.
Every sign off is stored with the tech, the inspector, the certificate authority, the timestamp, and the task it belongs to. Search by aircraft, by date, by inspector. The audit trail is a query.
Credentials
Expirations before they expire.
Technician certificates and shop authorizations surface expiring items on the audit readiness strip 30, 60, and 90 days out. Nothing lapses without lead time.
Tags
Every 8130 in place.
Consumed parts must have a tag attached at receiving. Missing tags surface on the audit readiness dashboard against the visit that needs them.
Calibrations
Tools in date.
Precision tooling calibrations surface expiring items and refuse a sign off against a lapsed instrument. The tool crib and audit readiness read the same list.
Records
Exportable maintenance record.
For every aircraft, any date range, exported and ready. The maintenance record is a live document, not a folder that has to be built.
coreop.io

8130-3 traceability

Part 9910289-3 · AK4821

1 of 5 on WO-0483

8130-3Authorized release certificate
Verified
Part number9910289-3
DescriptionFastener, cowl, structural
SerialAK4821
ConditionSVC · New surplus
Certifying authorityCessna Aircraft Company
Cert #CE-2026-11284
ReceivedJul 01 2026 · PO-1174
Installed onN724MJ · WO-0483 · T-04
Chain of custodyVendor → shop → aircraft
Audit readiness and the exportable maintenance record live on ERP because the back office is where the audit pack is pulled. Operational compliance (AD, SB, inspections, life limited components) lives on FMS because it is a floor responsibility.
What ERP produces

A back office that stops absorbing shop time.

Every artifact the ledger, the audit, and the customer will ever ask about is produced from the same visit and work order data. The back office stops rebuilding what the floor already did.

Keep going

See how the layer fits with the rest of the platform.