Two technicians working on an aircraft component together on the hangar floor.
FMS

Run the whole floor.

Visits contain work orders. Work orders contain task cards. Task cards carry labor, parts, sign off, and a required inspection flag. The board runs the shop, not a whiteboard.

coreop.io
coreop.io

Execution board

Shift 07:00 · 3 bays · 8 techs on

Live

Queued3

Nav1 heading cal

AV

MLG brake inspect

JT

Cabin light R&R

SM

Active4

100-hr inspection

RM

L cowl R&R

JT

Rigging check

DS

Boot pump wiring

RM

RII / signoff2

Rigging check

DS

Trim actuator

IA

Complete2

Tire replace

JT

Cowl fastener

JT

Drag to reassignLabor clock live
Structure

Visit. Work order. Task card. Sign off.

A visit is the aircraft in the door. It contains one or more work orders, each covering an inspection, a repair, a modification, or a scheduled service. Each work order breaks into task cards, and each task card is the smallest unit of work a technician performs, signs, and closes.

Step 1

Visit opens.

Intake produces the visit with the aircraft, the customer, the arrival snapshot, and the initial squawks.

Step 2

Work orders route.

The dispatcher opens work orders for the inspection, repair, or scheduled service scope. Standard scopes pull from your job library.

Step 3

Task cards execute.

Task cards carry labor, parts, and required inspection flags. Techs log time from the aircraft. Parts consumption ties the 8130 tag to the task.

Step 4

Sign off closes.

Dual sign off where required. Return to service generated from the work. Customer notified. Records land in the audit pack automatically.

coreop.io

Visit board

V-1204 · N724MJ

3 work orders

Labor logged

14.6 hr

Parts on order

4

RII pending

1

WO-0483Airframe · 100-hr insp
4/6Active
WO-0484Engines · L cowl R&R
2/2Complete
WO-0485Avionics · Nav1 cal
0/3Queued
Downtime: 1d 4h remainingBay 3 · Skyline MRO
RII and dual sign off

Two signatures where two are required.

Required inspection items are flagged at the task level. The system enforces the dual sign off: the technician who did the work, and the authorized RII inspector who verifies it. The close button is not available until both signatures are on the record and the certificate authority is valid.

  • RII flag lives on the task card, not on a separate sign off sheet.
  • Only an inspector with the correct authorization can sign the second slot. Enforcement is at the DB level.
  • Signatures capture the tech, the inspector, the timestamp, and the certificate authority in one row.
  • Sign off queue routes the right items to the right inspector, sorted by aircraft readiness.
coreop.io

RII task card

Flight control rigging check

WO-0483 · T-14

Rig aileron, elevator, and rudder controls per Cessna MM CH 27. Verify friction, cable tension, and travel stops. Required Inspection Item - dual sign-off enforced.

Mechanic

R. Mendez

A&P 3184927

Signed · Jul 02 10:12

Inspector

D. Sato

IA 2917403

Not signed

RIIClose gated on inspector signature
Awaiting inspectorSign as inspector
Execution board

Every open task by technician, aircraft, and hangar.

The execution board shows what is in progress right now: which task, which tech, which aircraft, which hangar bay. Filter by shift, by aircraft, by work order. Reassign with a click. Labor time posts to the work order in real time from the technician at the aircraft, not on a Friday afternoon catch up.

Scheduling is on the same board. Slots are aircraft aware, hangar aware, and technician skill aware. Nothing overbooked. Nothing hidden in a spreadsheet.

coreop.io

Execution board

Shift 07:00 · 3 bays · 8 techs on

Live

Queued3

Nav1 heading cal

AV

MLG brake inspect

JT

Cabin light R&R

SM

Active4

100-hr inspection

RM

L cowl R&R

JT

Rigging check

DS

Boot pump wiring

RM

RII / signoff2

Rigging check

DS

Trim actuator

IA

Complete2

Tire replace

JT

Cowl fastener

JT

Drag to reassignLabor clock live
Technician credentials

The right person for the sign off, every time.

Every technician carries a certificate profile: airframe and powerplant ratings, inspection authorization, avionics endorsements, expirations, and shop specific privileges. The system knows who can sign for what and refuses signatures that do not fit. Expirations surface before they cause a scramble.

  • A and P, IA, avionics endorsements, and shop specific privileges tracked per person.
  • Expirations surface 30, 60, and 90 days out in the compliance strip.
  • The sign off enforcement layer refuses signatures that do not match the required rating for the task.
coreop.io

Labor time clock

Live floor · today

Shift 07:00 to 15:30

Clocked in

3

Hrs today

17.4

WOs active

4

TechTaskInOutElapsedStatus
R. MendezWO-0483 · T-04 Fastener install07:14-02:31Clocked in
D. SatoWO-0482 · T-11 RII inspection07:0209:4102:39Closed
A. VasquezWO-0484 · T-06 Borescope06:55-02:50Clocked in
L. KimWO-0480 · T-02 Wire chase06:4108:1201:31Paused
M. TorresWO-0483 · T-07 Torque check08:22-01:23Clocked in
Labor rolls to WO3 clocked in · 1 paused
Operational compliance

Nothing sneaks up on a return to service.

Operational compliance is what you owe every aircraft every day. Airworthiness directives, service bulletins, scheduled inspections, and life limited components are tracked per aircraft, per component, with the due condition in the aircraft language: hours, cycles, or calendar. The due soon engine surfaces what is coming up on the next visit, the next month, and the next year.

AD compliance
Airworthiness directives
Each aircraft carries the AD list applicable to its make and model. Compliance status tracked per AD with the due condition in hours, cycles, or calendar. The next visit shows every AD that will hit its due window between now and release.
Service bulletins
Service bulletins
SBs applicable per aircraft, tracked as accomplished, deferred, or open. Manufacturer supplied SBs can be applied against the fleet in one action so the record is consistent across every affected aircraft.
Inspections
Scheduled inspections
Annual, phase, progressive, and program inspections tracked per aircraft. Interval math in the aircraft language: hours, cycles, or months. Due soon rules surface the inspection at the visit that should catch it, not the visit after.
Life limited components
Life limited components
Serialized parts with an operating life limit tracked per component. Life used per event is logged automatically as the aircraft accrues time. Approaching limits surface with lead time to plan the replacement.
Due soon engine
Due soon engine
One engine reads every AD, SB, inspection, and life limited component per aircraft and produces the answer to the question every dispatcher asks: what does this aircraft owe on the next visit, the next month, and the next year.
coreop.io

Return to service

N724MJ · Maintenance release

WO-2026-0483

All corrective actions closed. 4 tasks complete. 14.6 hrs labor. 5 parts installed with 8130-3 traceability recorded.

Mechanic

R. Mendez

A&P 3184927

Inspection Authorization

D. Sato

IA 2917403

Logbook entry

Performed 100-hr insp per Cessna MM CH 5. Replaced L eng cowl fastener and R main gear tire. Aircraft approved for return to service.

RTS Jul 02 2026Returned to service
Operational compliance lives on FMS because it is a floor responsibility, not a records task. It runs beside the execution board. Audit readiness and the maintenance record live on ERP, where the back office pulls the audit pack.
Sign off and return to service

RTS produced from the work performed.

When the last task closes, the return to service record is generated from the tasks, the parts, the sign offs, and the parts tags. Nothing to retype. Nothing to reconcile. The RTS is a byproduct of the work, not a second job at the end of the visit.

  • RTS record generated from the executed tasks and their sign offs.
  • Maintenance record updated on the aircraft, ready for export any time.
  • Customer notification with the RTS record ready for download.
coreop.io

Return to service

N724MJ · Maintenance release

WO-2026-0483

All corrective actions closed. 4 tasks complete. 14.6 hrs labor. 5 parts installed with 8130-3 traceability recorded.

Mechanic

R. Mendez

A&P 3184927

Inspection Authorization

D. Sato

IA 2917403

Logbook entry

Performed 100-hr insp per Cessna MM CH 5. Replaced L eng cowl fastener and R main gear tire. Aircraft approved for return to service.

RTS Jul 02 2026Returned to service
What FMS produces

A shop that closes on its own.

Task by task. Sign off by sign off. The visit closes, the aircraft leaves ready for release, and the records are already in the audit pack. The night shift does not stay for paperwork.

Keep going

See how the layer fits with the rest of the platform.